Harbour & Railway Industry
Already around 1990 came the first modules with industry issues on the box used a simple flat module. Many of the modules were only 30cm wide to accommodate many of the modules during transport. Some 10 years later, the subject of industrial and port was taken up again. Some modules were made with a 50cm width. It was agreed to make the track on one side of the module in order to better build port buildings. At the regional meetings was then discussed and tested. Also, some modules are built wider than 50cm.
In 2005, the results were then compiled to an industrial and port profile design IH05. To date, several modules with rangierintensiven port and industrial themes have emerged. To the seamless approach to other H0 Europe FREMO usual profiles, ensured various modules were built with different profiles.
On the industry and harbor railway
On the IH-modules, private railways can be found as well as the respective state railways. Depending on the meeting, the situation is adjusted. In recent years, a number of modules have been created that provides a varied infrastructure. If several of the IH profiles can be found in one line, we like to use "shunting radio" and trainleader.