3. Epoch 4 / FREMOdern and US meeting in Kolding
Participants from Germany, Denmark and Norway took part in this meeting.
We could build an arrangement with 110 meters; a main stretch, a side stretch and two industrial stretches.
In total we got to run 7 timetables. Each schedule contained sufficient passenger and freight trains. We ran in the period 1980-1987. This allowed us to deploy brown and red locomotives.
On the side track, we started with a MO and finished with MR. MA Lyntog was replaced during timetables 4-6 from red to silver arrow (one carriage at a time).